• Price/Package: US $8.22
  • Promo Price:

    US $5.34

    YOUR PRICES

    00 Days 00 : 00 : 00

  • 3 Days
    Shipping Weight: 1,000(g)
  • Pay with your Visa credit card Learn more

    Pay with your Mastercard

    Pay by Paypal Learn more

    Bank Transfer Learn more

  • Coupon: US $110.00 for NEW Client. Register Now >>
  • Shipping Time:
  • I Want Smaller Lots

    Ask a Question

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

Specification Size Info

Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
Material Maple Wood
Color Light Yellow
Shape Oval
Usage Beads
Package Size 1,000 g per package

Product Description

Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow

Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

Priced per 1,000 g

Please Note: The color may be slightly different from the picture because of different display device.

Customer Reviews

Customer Questions

Confirm

Please Note

OK

Please Note

OK

Search by Image

·Search kbeads with an image instead of text. Try dragging an image here.

  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
  • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
    2. The size of the image should be less than 5M!
    3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

Uploading File